CPG CBR24 설치 및 작동 지침 - 페이지 5

{카테고리_이름} CPG CBR24에 대한 설치 및 작동 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. CPG CBR24 16 페이지.

These instructions are for the conversion from Natural Gas to Propane (L.P.) on all models. The
conversion should be done before connecting the unit to the gas supply.
Units are shipped from the factory equipped for use on natural gas. Orifices necessary for LP
(propane) are provided in a bag tied to the valve on the front panel.
1. Remove the knobs and front panel.
1. Remove the knobs and
front panel.
Note: Unit Number on side
of orifice fittings.
Regulator with brass cap

CONVERSION

2 . Uns
Plastic Insert
L.P Position of insert
5
2. Unscrew bolts and pilot valve,
then remove the manifold.
3. Replace the orifice
fittings into the valve.
4. Install the front
panel knobs
5. Before installing the regulator,
unscrew the octagonal cap, up you can
read (NAT) on the plastic insert out of
the cap, flip it over and snap back in
place. You can now read (L.P).
6. Continue with
installation.