CPS Pro-Set TR600 Series 소유자 매뉴얼 - 페이지 7
{카테고리_이름} CPS Pro-Set TR600 Series에 대한 소유자 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. CPS Pro-Set TR600 Series 16 페이지. Refrigerant recovery machines
CPS Pro-Set TR600 Series에 대해서도 마찬가지입니다: 소유자 매뉴얼 (8 페이지)
PUSH-PULL LIQUID RECOVERY
TO MINIMIZE RECOVERY TIME:
A. Use shortest length 3/8" (Inside Diameter) Refrigeration Hose on Suction Side of Recovery Unit to
Vapor Port on Tank.
B. Use 3/8" (Inside Diameter) Refrigerant Hoses from system Liquid Service Valve to LIQUID Port on
Recovery Tank.
C. Use an evacuated DOT Tank (90lb or larger, and rated for 550 PSI/38 Bar).
D. If refrigerant is clean, remove all suction side filters, screens, etc.
E. Remove all Schrader type valve cores and any valve depressors from hoses and service valves.
1. Connect unit as shown in Diagram 2
EU Note: The recovery tank must be rated for 38 bar
2. Open Liquid and Vapor Valve on Recovery Tank
3. Open OUT Valve on unit.
4. Set Main Power Switch to ON.
5. When unit starts, open IN Valve on unit to start refrigerant flow.
6. Monitor weigh scale for increase of weight in the Recovery Tank, or view sight glass for liquid
refrigerant flow. WARNING: Do not over fill Recovery Tank.
7. Once the weight gain subsides or liquid refrigerant is no longer present in sight glass, close
Recovery Tank Vapor Valve. Set Main Power Switch to OFF once IN Gauge pulls in to a
vacuum.
LIQUID PUSH-PULL PROCEDURE IS NOW COMPLETE. PROCEED TO DIRECT LIQUID
OR VAPOR OPERATION.
Diagram 2 - Push-Pull Liquid Recovery
7