DGS Inline 조립 지침 - 페이지 2
{카테고리_이름} DGS Inline에 대한 조립 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. DGS Inline 3 페이지. Aisle gondola sign
Retail Gondola Shelving Mount
•
Set assembled sign in desired location on top of
gondola shelving back panel.
•
Attach sign to gondola shelving back panel. There are
two options to screw the sign in place.
•
Option 1 - To screw sign into the pegboard panel use
(2) #10 x 3/4" wood screws. Screw through the
bracket into the pegboard on both sides of the
gondola.
•
Option 2 - To bolt completely through the pegboard
back panel use (2) 10-24 x 3" nuts and bolts. Line up
bracket holes with pegboard holes and insert bolts
through the pegboard.
•
Make sure that the sign is level and not angled down.
Inline Aisle Gondola Sign
assembly instructions
Bend Tab 2x
Flat Surface or Cooler Top Mount
•
Bend bracket tab flanges upward.
•
Set sign on flat surface.
•
Screw sign down using (4) #10 x 3/4" wood screws or
appropriate fasteners for your application.
•
Your application may require drilling screw holes into the
flat surface.
pg. 2 of 3