Allied Telesis x900 Series 설치 매뉴얼 - 페이지 10
{카테고리_이름} Allied Telesis x900 Series에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Allied Telesis x900 Series 13 페이지. Removable power supply and fan
Allied Telesis x900 Series에 대해서도 마찬가지입니다: 구성 방법 (9 페이지)
Removable Power Supply and Fan
Table 2: LEDs on the switch reporting PSU status
LED
PSU 1
PSU 2
10
State
Description
Green
PSU 1 is installed and supplying power to the switch. The
voltage output is within specification.
Red
One of the following:
•
PSU 1 is installed in the switch and has exceeded its
recommended temperature threshold of 75º C
(167º F), or the fan has failed.
•
A FOM is installed in the switch and has failed.
•
The bay is empty. Applies to AT-8948, AT-9924T/4SP,
and AT-9924Ts switches since they require a FOM
when only one PSU is installed.
•
PSU 1 is not receiving power when dual PSUs have
been installed.
Off
A FOM is installed and operating at an acceptable speed.
For AT-9924T and x900-48FE switches, a blanking panel
is installed.
Green
PSU 2 is installed and supplying power to the switch. The
voltage output is within specification.
Red
One of the following:
•
PSU 2 is installed in the switch and has exceeded its
recommended temperature threshold of 75º C
(167º F), or the fan has failed.
•
A FOM is installed in the switch and has failed.
•
The bay is empty. Applies to AT-8948, AT-9924T/4SP,
and AT-9924Ts switches since they require a FOM
when only one PSU is installed.
•
PSU 2 is not receiving power when dual PSUs have
been installed.
Off
A FOM is installed and operating at an acceptable speed.
For x900-48FE switches, a blanking panel is installed.