Operation

*************************************************************
Never exceed the rated voltage as this will cause the Load Bank to
overheat, resulting in damage to equipment.
Do not apply DC voltages as the contactors do not have arc blowout
magnets.
DO NOT allow objects to enter or block screens.
*************************************************************
MANUAL OPERATION
1.
Place all switches on the control panel to the OFF position. Place MODE SELECT
MANUAL/AUTOMATIC operation toggle switch to MANUAL position.
2.
Verify that all electrical connections (Control, Load, and Grounding) to the Load Bank have
been completed as described in the INSTALLATION section.
*************************************************************
DO NOT operate the Load Bank over the rated voltage as this will
cause catastrophic failure in the Load Bank.
*************************************************************
3.
Place the control power ON/OFF switch to the ON position. The POWER ON light will
be energized, indicating control power is present.
4.
Start the generator under test.
SECTION IV
OPERATION
C A U T I O N
C A U T I O N
4-1
Avtron Load Bank