Avtron K711D36027 매뉴얼 - 페이지 10
{카테고리_이름} Avtron K711D36027에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Avtron K711D36027 17 페이지.
Operation
*************************************************************
Never exceed the rated voltage as this will cause the Load Bank to
overheat, resulting in damage to equipment.
Do not apply DC voltages as the contactors do not have arc blowout
magnets.
DO NOT allow objects to enter or block screens.
*************************************************************
MANUAL OPERATION
1.
Place all switches on the control panel to the OFF position. Place MODE SELECT
MANUAL/AUTOMATIC operation toggle switch to MANUAL position.
2.
Verify that all electrical connections (Control, Load, and Grounding) to the Load Bank have
been completed as described in the INSTALLATION section.
*************************************************************
DO NOT operate the Load Bank over the rated voltage as this will
cause catastrophic failure in the Load Bank.
*************************************************************
3.
Place the control power ON/OFF switch to the ON position. The POWER ON light will
be energized, indicating control power is present.
4.
Start the generator under test.
SECTION IV
OPERATION
C A U T I O N
C A U T I O N
4-1
Avtron Load Bank