Dell PowerEdge 100 설치 매뉴얼 - 페이지 29
{카테고리_이름} Dell PowerEdge 100에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dell PowerEdge 100 32 페이지. Dell poweredge 350 servers: installation guide
support.dell.com
captive
fastener
Figure 1-20. Installing the Cable-Management Arm
2.
Align the free end of the cable-management arm (the end with the pin and cap-
tive thumbscrew) to the back end of the right (or left) side inner rail (as viewed
from the back) of the system.
3.
Secure the cable-management arm to the inner rail with the captive thumbscrew
(see Figure 1-20).
4.
Attach the input/output (I/O) cables to their respective expansion cards on the
back of the system.
5.
Connect the remaining cables to the system.
For details, see your system's Installation and Troubleshooting Guide and User's
Guide.
6.
Secure the cables to the cable-management arm:
a.
After connecting the cables to the system, unscrew the thumbscrews that
secure the front of the server to the front vertical rail.
b.
Slide the system forward to the fully extended position.
c.
Route the cables along the cable-management arm, allowing some additional
cable slack at the hinge positions, and secure the cables to the cable-
management arm with the Velcro straps attached to the cable-management
arm.
pin
Rack Installation Guide
1-23