Cable Routing Procedures for the Dell PowerEdge R520 System
Figure 11.
Section 4: Cabling a PowerEdge R520 system installed on static
rails
NOTE: The CMA is compatible only with the sliding rails, not the static rails.
1. Follow the instructions contained in the Rack Installation Instructions found in the static rail kit to
install the server into a two-post or four-post rack.
2. Install the hook-and-loop straps provided in the rail kit through the slots in the rear brackets of the
rails as described in the Rack Installation Instructions.
3. Connect all applicable cables to the rear of the system and verify that all connections are secure.
4. Using the hook-and-loop straps, bundle the cables and secure them to either the left rail or right
rail as described in the Rack Installation Instructions. See Figure 12 for an example of data cables
secured to the left rail and power cables secured to the right rail (as viewed from the rear of the
system).
Figure 12.
Removing the outer CMA brackets for shallow racks
Cabling a system installed in static rails