EarthLinked ACM-1836C 설치 매뉴얼 - 페이지 8

{카테고리_이름} EarthLinked ACM-1836C에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. EarthLinked ACM-1836C 11 페이지. Auxiliary cooling module

Figure 4. Top View of Line Set Connections
All refrigerant piping joints and connections in the EarthLinked® heating and cooling system,
including the Auxiliary Cooling Module, line sets and earth loop system are to be brazed with
15% silver content brazing alloy, utilizing the NITROGEN BRAZING PROCESS.
ACM-410CP-IM (05/13)
Page 8