Dell SC7020 시작하기 매뉴얼 - 페이지 6
{카테고리_이름} Dell SC7020에 대한 시작하기 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dell SC7020 15 페이지. Sc7020 series
Dell SC7020에 대해서도 마찬가지입니다: 소유자 매뉴얼 (22 페이지), 소유자 매뉴얼 (20 페이지), 시작하기 매뉴얼 (17 페이지)
The SC7020 storage system ships with a ReadyRails II kit. The rails come in
two different styles: tool-less and tooled. Follow the detailed installation
instructions located in the rail kit box for your particular style of rails.
NOTE:
•
The storage system and expansion enclosures each require 3U of
rack space for installation.
•
Dell recommends using two people to install the rail, one at the front
of the rack and one at the back.
Figure 2. Hole Locations in Rack
1.
Pin hole
2.
Rack mounting screw hole
3.
Pin hole
4.
Rack mounting screw hole
Follow this procedure to install the storage system in a rack.
1.
Position the left and right rail end pieces labeled FRONT facing inward
and orient each end piece to seat in the holes on the front side of the
vertical rack flanges.
2.
Align each end piece with the top and bottom holes of the desired U
space.
3.
Engage the back end of the rail until it fully seats on the vertical rack
flange and the latch clicks into place.
4.
6