Dell Storage Center SCv2020 시작하기 매뉴얼 - 페이지 14
{카테고리_이름} Dell Storage Center SCv2020에 대한 시작하기 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dell Storage Center SCv2020 20 페이지. Storage center
Dell Storage Center SCv2020에 대해서도 마찬가지입니다: 소유자 매뉴얼 (42 페이지), 시작하기 매뉴얼 (19 페이지)
NOTE: In an SCv2000/SCv2020 storage system, the top storage controller is storage controller 1
and the bottom storage controller is storage controller 2.
1.
If you are installing more than one expansion enclosure, cable the expansion enclosures in series by
connecting a SAS cable from the top EMM, port B of one expansion enclosure to the top EMM, port
A of the next expansion enclosure. Continue cabling the expansion enclosures in series until all of
the expansion enclosures are connected together.
2.
Connect a SAS cable from storage controller 1: port A to the first expansion enclosure in the SAS
chain: top EMM, port A.
3.
Connect a SAS cable from storage controller 2: port B to the last expansion enclosure in the SAS
chain: top EMM, port B.
4.
Connect a SAS cable from storage controller 1: port B to the last expansion enclosure in the SAS
chain: bottom EMM, port B.
5.
Connect a SAS cable from storage controller 2: port A to the first expansion enclosure in the SAS
chain: bottom EMM, port A.
Figure 9. Cabling an SC100/SC120 Expansion Enclosure to an SCv2000/SCv2020 Storage System
1.
SCv2000/SCv2020 storage system
3.
Storage controller 2
5.
Expansion enclosure 2
Connecting the Power Cables
Connect power cables to the storage system.
1.
Make sure that the power switches on the storage system are in the OFF position before connecting
the power cables.
2.
Connect the power cables to the power supplies in the storage system chassis.
14
2.
Storage controller 1
4.
Expansion enclosure 1