Dell Networking S6000 System 시작하기 매뉴얼 - 페이지 22
{카테고리_이름} Dell Networking S6000 System에 대한 시작하기 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dell Networking S6000 System 37 페이지. Dell networking s6000 high-performance 10/40 gbe top-of-rack switch
Dell Networking S6000 System에 대해서도 마찬가지입니다: 테스트 보고서 (19 페이지)
Two-Post Flush-Mount Configuration:
1 For this configuration, remove the castings from the front side of each
ReadyRails assembly. Refer to
remove the two screws from each front flange ear (on the switch side of the
rail) and remove each casting. Retain the castings for future rack
requirements. It is not necessary to remove the rear flange castings.
Figure 4-2. Two-Post Flush-Mount Configuration
2 Attach one rail to the front post flange with two user-supplied screws. Refer
to
Figure
4-2, item 2.
3 Slide the plunger bracket forward against the vertical post and secure the
plunger bracket to the post flange with two user-supplied screws. Refer
to
Figure
4-2, item 3.
4 Repeat this procedure for the second rail.
18
Installation
Figure
4-2, item 1. Use a Torx driver to