Dell PowerEdge M420 사용자 설명서 - 페이지 13

{카테고리_이름} Dell PowerEdge M420에 대한 사용자 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. Dell PowerEdge M420 22 페이지. Dell poweredge blade servers getting started guide
Dell PowerEdge M420에 대해서도 마찬가지입니다: 정보 업데이트 (38 페이지), 릴리스 정보 (27 페이지), 매뉴얼 (25 페이지), 사용자 설명서 (23 페이지), 중요 정보 매뉴얼 (35 페이지), 업데이트 매뉴얼 (32 페이지), 업데이트 매뉴얼 (28 페이지), 사용자 설명서 (26 페이지), 시작하기 매뉴얼 (12 페이지), 매뉴얼 (38 페이지), 기술 매뉴얼 (46 페이지), 기술 매뉴얼 (48 페이지), 포트폴리오 매뉴얼 (27 페이지), 시작하기 매뉴얼 (14 페이지), 시작하기 매뉴얼 (12 페이지)

Dell PowerEdge M420 사용자 설명서
Dell -10GbE PTM

2.4.4 Mechanical Installation

2.4.4.1 To install the PTM
1. Make sure that there is no foreign matter or dirt in the back plane connector or in the chassis slot.
2. Push the PTM into the chassis. Make sure that the ears on the latch hook onto the latching bar.
3. Push the latch handle towards the orange latch release until it locks.
2.4.4.2 To remove the PTM
1. Push the orange latch release and the latch handle will pop out
2. Pull the handle out until it is 90 degrees from the front of the PTM.
3. Pull the PTM out of the chassis.

2.4.5 Cable Installation

All cables can be inserted or removed with the unit powered on. To insert a cable, press the con-
nector into the port receptacle until the connector is firmly seated. The GREEN LED indicator,
above each SFP+ port, will light when the physical connection is established (that is, when the unit
is powered on and a cable is plugged into the port with the other end of the connector plugged into
a functioning port). After plugging in a cable, lock the connector using the latching mechanism
particular to the cable vendor. When a logical connection is made the yellow light will come on.
When data is being transferred the yellow light will blink.
To remove, disengage the locks and slowly pull the connector away from the port receptacle. Both
LED indicators will turn off when the cable is unseated.
Cable lengths should be used which allow for routing horizontally around to the side of the chassis
before bending upward or downward in the rack.
CLASS 1 LASER PRODUCT and reference to the most recent laser
standards:
IEC 60825-1:2007/03 y EN 60825-1:2007
Always install and remove cables by pushing or pulling the cable and
connector in a straight line with the pass through module.
Cables, especially long copper cables, can weigh a substantial amount.
Make sure that the weight of the cable is supported on its own and not
hanging from the pass through module.
Rev 1.0
13