Dell PowerEdge M820 Systems 사용자 설명서 - 페이지 25

{카테고리_이름} Dell PowerEdge M820 Systems에 대한 사용자 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. Dell PowerEdge M820 Systems 26 페이지. Dell poweredge blade servers getting started guide
Dell PowerEdge M820 Systems에 대해서도 마찬가지입니다: 정보 업데이트 (38 페이지), 릴리스 정보 (27 페이지), 사용자 설명서 (23 페이지), 중요 정보 매뉴얼 (35 페이지), 업데이트 매뉴얼 (32 페이지), 업데이트 매뉴얼 (28 페이지), 사용자 설명서 (22 페이지), 시작하기 매뉴얼 (12 페이지), 소유자 매뉴얼 (3 페이지), 기술 매뉴얼 (46 페이지), 포트폴리오 매뉴얼 (27 페이지), 시작하기 매뉴얼 (14 페이지), 시작하기 매뉴얼 (12 페이지), 기술 매뉴얼 (47 페이지)

Dell PowerEdge M820 Systems 사용자 설명서
Dell 10Gb Ethernet Pass Through II
5
Troubleshooting
This section provides troubleshooting information for common error conditions. If the described
procedure does not solve the problem, please contact your Dell representative for assistance.
Please use the following table to identify the required correctional operation:
Error Condition
10GbE PTM power LED does not turn on See
Downlink connection to a blade server
does not come up
Uplink connection to remote switch does
not come up
Unable to connect to 10GbE PTM10GbE
PTM CLI
10GbE PTM CLI hangs during operation See
10GbE PTM software update procedure
fails
5.1

Resolving 10GbE PTM Power Problems

Make sure the system is powered on.
Take out the 10GbE PTM, wait for 10 seconds and plug it back in.
5.2

Resolving Link Connectivity Problems

1. Check that external cables and/or optical modules are properly inserted.
2. Make sure the cables/modules are supported by the 10GbE PTM.
3. Log in to 10GbE PTM CLI and run the "show port link" command. Check the status of the
downlink and uplink in the relevant port – see
a. If a blade is inserted but not recognized by the 10GbE PTM – restart the network device in the
blade and check again. Reboot the blade if the problem is not resolved.
b. If an Ethernet NIC or switch is connected to an 10GbE PTM external port but the link is down for the
10GbE PTM external port – check cables/modules connectivity in the external device and reboot the
external device if not resolved.
If none of the above resolves the issue – reboot the 10GbE PTM through the CMC CLI using the
following command:
Table 6 - Error Conditions and Correctional Operation
Section 5.1, "Resolving 10GbE PTM Power Problems," on
page 25
Section 5.2, "Resolving Link Connectivity Problems," on
See
page 25
Section 5.2, "Resolving Link Connectivity Problems," on
See
page 25
Section 5.4, "Resolving CLI Connectivity Problems," on
See
page 26
Section 5.5, "Recovery From Non-Responsive 10GbE PTM
CLI," on page 26
Section 5.6, "Recovery From a Software Update Failure," on
See
page 26
Correctional Operation
Section 3.7.1
for details.
Rev 1.00
25