Dell S4128F-ON Series 설치 매뉴얼 - 페이지 19
{카테고리_이름} Dell S4128F-ON Series에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dell S4128F-ON Series 47 페이지.
Dell S4128F-ON Series에 대해서도 마찬가지입니다: 설치 매뉴얼 (48 페이지)
To install the S4100–ON Series (S4128F-ON and S4148F-ON), complete the installation procedures in the order presented in this section.
Always handle the S4100–ON Series switch and its components with care. Avoid dropping the switch or any field replaceable units (FRUs).
NOTE:
ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when
handling the S4100–ON Series switch and its components. As with all electrical devices of this type, take all the necessary safety
precautions to prevent injury when installing this switch.
NOTE:
For more information, see the
Topics:
•
Unpack the switch
•
Rack or cabinet installation
•
ReadyRails installation
•
S4100-ON Series installation
•
Optics installation
•
Switch power-up
•
After switch installation
Unpack the switch
NOTE:
Before unpacking the switch, inspect the container and immediately report any evidence of damage.
When unpacking the S4100–ON Series switch, make sure that the following items are included:
•
One S4100–ON Series (S4128F-ON and S4148F-ON) switch
•
One RJ-45 to DB-9 female cable
•
Two sets of rail kits, no tools required
•
Two PSUs
•
Four fan units
•
Two country- and region-specific AC power cords
•
Dell S4100–ON Series Setup Guide
•
Safety and Regulatory Information
•
Warranty and Support Information
Unpack
1
Place the container on a clean, flat surface and cut all straps securing the container.
2
Open the container or remove the container top.
3
Carefully remove the switch from the container and place it on a secure and clean surface.
4
Remove all packing material.
S4100–ON Series installation
Open Networking Hardware Diagnostic Guide .
S4100–ON Series installation
4
19