Earthsafe M300 설치, 운영 및 유지보수 매뉴얼 - 페이지 10

{카테고리_이름} Earthsafe M300에 대한 설치, 운영 및 유지보수 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Earthsafe M300 16 페이지. Filtration polisher

INSTALLATION, OPERATION, AND MAINTENANCE

Installation

1. Remove packaging and inspect for shipping damage. Note any shipping damage on the
shipping ticket and notify Earthsafe within 24 hours of receipt.
2. Set unit at installation location. Use proper handling procedures to avoid damage to
the unit.
3. Install anchor bolts at 4 corners. Use ½" diameter expansion anchors with 3" embedment
or as required for local code compliance.
4. Connect power to motor starters and controller. Reference specific installation
instructions and wiring diagrams for the controller and motor starter panels.
5. Check tightness of all bolts, which may have loosed during shipment. Tighten 4 bolt
flanges by gradually tightening across the bolt pattern.
6. Pressure test the pump set to 50 PSI or in accordance with project design requirements.
Correct any loose bolts or threaded joints if required.
7. Connect piping to inlet and outlet (inlet piping considerations). Confirm that field piping
is independently supported to avoid stress on the pump set piping.
8. Check pump rotation. Energize the pump momentarily to observe direction of motor fan
rotation. The pump inlet and outlet are offset from the centerline of the pump head, so
that there is a long arc or short arc from the inlet to the outlet. The pump rotation should
be that it progresses along the long arc from the inlet to the outlet.
Model M300
Filtration Polisher
EMERGENCY POWER FUEL SYSTEMS
10 of 16
earth safe
Fuel Systems for Critical Power