EarthWay 2170T 조립 및 작동 지침 매뉴얼 - 페이지 4

{카테고리_이름} EarthWay 2170T에 대한 조립 및 작동 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. EarthWay 2170T 6 페이지. Commercial tow broadcast spreader
EarthWay 2170T에 대해서도 마찬가지입니다: 조립 및 작동 지침 매뉴얼 (6 페이지)

EarthWay 2170T 조립 및 작동 지침 매뉴얼
GAUGE & LEVER
ASSEMBLY
Lever Tensioning Nut
15. Install flattened end of control rod in to lever on gauge as shown. Turn to lock in
place. Next push lever forward to setting "0". Align control rod with hole in pivot
bracket, pull lever backward to insert control rod through hole in pivot bracket. Now
install 1/4-20 regular nut on to control rod.
16. Pull lever back to setting "30" as shown. Next push pivot & bracket forward
so that the shut off plate in the hopper is in the full open position. REMEMBER
SETTING "30" ON THE FLOW CONTROL LEVER MUST PLACE THE
SHUT-OFF PLATE IN THE FULL OPEN POSITION TO BE PROPERLY
CALIBRATED. Now tighten the nuts against the pivot bracket to prevent change in
calibration.
17. Tension on the flow control lever may be adjusted by tightening or loosening the
tension nut as shown.
18. Insert agitator to pinion shaft on inside of hopper.
Note: the position of flat side of the agitator. This pin
should be installed as shown.
19. Install debris screen into hopper, then insert 1/4-20 x 1"
Stainless Steel Hex Bolt thru the hole in the side wall of the
hopper. Secure with Stainless Steel lock nut - TIGHTEN
WITH HAND TOOLS ONLY
PAGE 4
Gauge Setting
Overlay
Control Rod
Tabbed Hole
Control Rod
14. Install (1) 1/4-20 regular nut (not a locknut)
on to control rod as shown.
1/4-20 x 1"
Hex Head Bolt
Stainless
Pivot
Rod
Pivot
Control
Bracket
Rod
1/4-20 Lock Nut
Stainless
¼-20
Hex Nuts