360 Yield 360 Y-DROP CASE 80 BOOM 사용 설명서 - 페이지 3

{카테고리_이름} 360 Yield 360 Y-DROP CASE 80 BOOM에 대한 사용 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. 360 Yield 360 Y-DROP CASE 80 BOOM 11 페이지.

ESTABLISH
I.
DROP LOCATIONS
Figures 1 and 2
Step 1
Locate the center of the machine and
identify the location of all the drops. On
the sprayer boom, mark where each riser
mount will be located. This will ensure
that the extension tubes will not interfere
with the riser mounts.
Figure 3
Step 2
For the primary boom; starting at the
wing fold pivot pin, measure out and
make marks at 61", 131", 190", 256"
and 310" (all measurements are ±5").
Repeat for the other primary boom.
INSTRUCTIONS 360 Y-DROP
Figure 1
Figure 2
61"
131"
190"
256"
310"
Figure 3
360YIELDCENTER.COM
ROGATOR
3