360 Yield 360 Y-DROP CASE 90 BOOM 사용 설명서 - 페이지 5

{카테고리_이름} 360 Yield 360 Y-DROP CASE 90 BOOM에 대한 사용 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. 360 Yield 360 Y-DROP CASE 90 BOOM 11 페이지.

INSTALL CENTER SECTION
III.
SQUARE TUBE
Figure 6
Step 1
With the threads pointing down, install
square U-bolt (1) on the front OEM center
section boom.
Center Section:
Rogator 80, 90, 100 - Use Bag AD and Bag AJ
Rogator 120 - Use Center Section Kit
Step 2
Position bracket assembly (2) and install
3/8" flange nuts (3).
Step 3
With the threads pointing down, install
square U-bolt (4) on the rear OEM
center section boom.
Step 4
Install adapter plate (5) and 3/8" flange
nuts (6).
Step 5
Install extension tube (7) onto bracket
assembly (2).
Figure 7
Step 6
Install boom bracket (1) onto extension
tube (2).
Bag BB
Step 7
Install stop bolt assemblies (3).
Step 8
Install stop bolts (3) at both the front and
the rear of the extension tube.
Repeat Steps 1-8 for the other center section mount.
Figure 8
Step 9
Install stainless steel set screw and
jam nut assembly (1) onto the bracket
assemblies.
Hardware Kit D
INSTRUCTIONS 360 Y-DROP
5
1
2
3
Figure 6
3
Figure 7
1
Figure 8
360YIELDCENTER.COM
ROGATOR
2
4
6
7
3
1
2
1
5