Miele ABLG 200 운영 및 설치 매뉴얼 - 페이지 10

{카테고리_이름} Miele ABLG 200에 대한 운영 및 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Miele ABLG 200 24 페이지.

Miele ABLG 200 운영 및 설치 매뉴얼
Installation
^ Make a C 185 mm hole in the wall.
^ Push the telescopic wall pipe into the
hole so that it is sitting flush.
The telescopic wall pipe will make it
easier to feed the control cable and
the flexible ducting through later on.
^ Position the motor unit fixing bracket
on the outside wall with the control
cable connection at the bottom.
^ Mark the positions for three drill holes.
^ Drill three 8 mm C holes and plug
with S8 plugs.
10
^ Connect the 3 mountings through the
fixing holes in the bracket as illustrated.
^ Position the bracket onto the outside
wall again and feed the control cable
with the six-pole connectors through
the telescopic wall pipe into the
house.
^ If equipotential bonding is required,
pull the earth cable through the gap
provided.
Equipotential bonding is required if
the control cable is to be extended
by more than the extension cable
supplied (see "Electrical connection").