Miele DA 218 작동 및 설치 지침 - 페이지 33
{카테고리_이름} Miele DA 218에 대한 작동 및 설치 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Miele DA 218 44 페이지. Ventilation system
Miele DA 218에 대해서도 마찬가지입니다: 작동 및 설치 지침 (44 페이지)
^ Drill two
1
/
" (3 mm) holes, one at
8
4" (100 mm) and one at S + 16
(425 mm) on the center line for the
retaining plate (see "Appliance
dimensions").
^ Lightly secure retaining plate A into
position using 5 x 40 mm screws
through the two holes and use the
notches to align with the center line.
+
3
/
"
4
^ Drill 4 more
the now fitted retaining plate.
^ Screw two 5 x 40 mm screws into the
upper two holes.
^ Hold retaining plate B to the wall and
push up until it is directly below the
ceiling. Use the notches and the
center line to align it horizontally.
Mark the 2 drill holes on the wall.
^ Drill two
wall.
^ Secure the retaining plate with two
5 x 40 mm screws.
1
/
" (3 mm) holes through
8
1
/
" (3 mm) holes into the
8
33