Miele DA 220-2 EXT 운영 및 설치 매뉴얼 - 페이지 26

{카테고리_이름} Miele DA 220-2 EXT에 대한 운영 및 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Miele DA 220-2 EXT 36 페이지. Cooker

Miele DA 220-2 EXT 운영 및 설치 매뉴얼
Ceiling plate:
Ceiling plate:
Ceiling plate:
26
^ Address the ceiling plate and posi-
tion it exactly. The orange coloured
arrow on the ceiling plate must face
to the front of the cooker hood.
Mark the position of the four holes to
be drilled a for securing the ceiling
plate and the position of the hole for
feeding the mains cable b through.
Select the cut-out providing the short-
est route for the mains connection
cable b to reach the cooker hood
connector.
^ If the cooker hood is to be connected
to an external fan motor, also mark
the position of gap c for the connec-
tion cable.
^ Lay the mains cable and the exhaust
ducting C 150 mm in the ceiling
space.
If site conditions are not suitable for
C 150 mm ventilation ducting then
C 125 mm ventilation ducting can be
used, in which case a suitable reducing
collar is needed which can be pur-
chased from your supplier or from the
Spare Parts Dept., (see "Installation –
Extraction" for further details).