Allmatic MOVEO 600KG 230V 매뉴얼 - 페이지 4
{카테고리_이름} Allmatic MOVEO 600KG 230V에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Allmatic MOVEO 600KG 230V 8 페이지. Irreversible operator for sliding gates
BASE PLATE INSTALLATION
1. Push the achors until they are 90° as shown in the picture
2. Insert the 4 screws (supplied) as shown in the image, from the bottom to the top of the backing plate
3. Screw completely the 4 nuts (supplied) as shown in the image
4. Position the backing plate with the tightened screws and nuts on the concrete foundation (wet cement)
5. Wait for the necessary time (2-3 weeks)
6. Unscrew the nuts previously tightened from the 4 screws
7. Proceed with the positioning and fixing of the MOVEO geoarmotor (use the same nuts previously used)
Plan for one or more sheathing for the passage of the power lines.
Note: It is necessary to know the rack dimensions to can calculate exactly the counter-plate positioning (Fig. 4).
h1 93 mm
h2 2 mm (backing plate thikness)
d1 0 ÷ 10 mm
10 / 32
Fig. 3
Fig. 2
Fig. 4
6-1624870
rev.1
09/05/2019