Miele PUR 98 D 작동 및 설치 지침 - 페이지 23
{카테고리_이름} Miele PUR 98 D에 대한 작동 및 설치 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Miele PUR 98 D 44 페이지. Ventilation system
Miele PUR 98 D에 대해서도 마찬가지입니다: 작동 및 설치 지침 (40 페이지), 작동 및 설치 지침 (48 페이지), 작동 및 설치 지침 (44 페이지), 매뉴얼 (48 페이지)
Before installation
Before installing the appliance,
read all of the information contained
in this chapter and also in the
"IMPORTANT SAFETY
INSTRUCTIONS" section.
Information is subject to change. Please
refer to our website to obtain the most
current product specification, technical
& warranty information.
Installation parts
4 1/4 x 4 5/16" (7 x 110 mm) screws
and
4 3/8 x 3 1/8" (10 x 80 mm) plugs
for securing the ventilation system to
the ceiling (not for use in USA / CDN).
The screws and plugs are designed
for use in solid ceilings only.
Use different fasteners for other
construction types. Make sure that
the ceiling can support the load.
4 telescopic extension piece holders
for aligning and securing the telescopic
extension piece
4 M4 x 8.5 mm screws
for securing the telescopic extension
piece holders.
14 M4 x 8 mm screws
for securing the spacer frame and
securing the ventilation system to the
installation frame.
1 M4 x 16 mm screw
for securing the chimney.
DUI 32 conversion kit for
recirculation mode
(not supplied, available as an optional
accessory). The kit contains a
directional unit socket and flexible
aluminum hose with hose clips.
Keep the following in a safe place:
1 lever
for replacing the bulbs.
Installation
23