360 Yield 360 Y-DROP MILLER 사용 설명서 - 페이지 8
{카테고리_이름} 360 Yield 360 Y-DROP MILLER에 대한 사용 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. 360 Yield 360 Y-DROP MILLER 12 페이지.
INSTALL BREAKAWAY ASSEMBLY -
V.
ONE PIECE
Figure 15
Step 1
Install breakaway assembly - one piece (1)
using the square U-bolts (2) and the extra
thick washer and Nylock nut. Repeat for
the remaining breakaway assemblies -
one piece.
Hardware Kit C
NOTE: The alignment and quantity of the mounts
will depend on your row spacing.
Figure 16
Step 2
Install riser tube assembly (1) into the
breakaway assembly - one piece (2).
Step 3
Install pin (3).
Repeat Steps 2 and 3 for the remaining riser tube
assemblies.
NOTE: Included in most sprayer mount packages
are standard riser mounts to be used when primary
booms are folded and in transport mode. These
standard riser mounts should be mounted in
locations that allow you to relocate the drops away
from potential tire interference. See "Install Riser
Mounts Without Breakaway Assemblies" section on
next page for more instructions.
INSTRUCTIONS 360 Y-DROP
2
Figure 15
Figure 16
MILLER
NEW HOLLAND
1
3
2
1
360YIELDCENTER.COM
8