ABB ACQ580-01 Series 빠른 설치 및 시작 매뉴얼 - 페이지 5

{카테고리_이름} ABB ACQ580-01 Series에 대한 빠른 설치 및 시작 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. ABB ACQ580-01 Series 16 페이지. Ul type 4x (ip66) drives, nec types
ABB ACQ580-01 Series에 대해서도 마찬가지입니다: 매뉴얼 (16 페이지), 빠른 설치 및 시작 매뉴얼 (17 페이지), 빠른 설치 및 시작 매뉴얼 (17 페이지)

ABB ACQ580-01 Series 빠른 설치 및 시작 매뉴얼
2.
Prepare the power cables (conduit):
Attach the cable conduit fittings for the motor and input cabling to the cable entry holes
PE
3.
Connect the power cables. For the tightening torques, refer to
Slide the conductors through the conduit.
Connect the conductors:
Connect the phase conductors of the motor cable to terminals T1/U, T2/V and T3/W. Connect the twisted shield of
the cable to the grounding terminal. (3a)
Connect the grounding conductor to the grounding terminal. Connect the phase conductors of the input power
cable as was done for the motor cabling. Use terminals L1, L2 and L3 if no disconnect option is present
optional disconnect is present, connect the input power cable conductors to the disconnect switch at terminals 2T1,
4T2 and 6T3. (3b)
If used, connect the brake resistor cables.
4.
Secure the conduits outside the unit mechanically. In wet, dirty, dusty, corrosive or similar locations, all fittings must be
properly tight and secured such that no leakage can occur.
R1...R2 without disconnect
INPUT
PE
3b
L1 L2 L3
R3 without disconnect
INPUT
PE
L2
L1
L3
3b

12. Connect the control cables

Make the connections according to the application. Keep the signal wire pairs twisted as near to the terminals as possible.
1.
Attach cable fitting/grip to the small cable entry hole. Slide the control cables through the cable fitting/grip.
2.
Ground the shield at one end of the cable only. If you ground the shield at the source of the signal, do not ground it at
the SCR terminal.
3.
Tie all control cables to the provided cable tie mounts.
4.
Secure the conduit outside the unit mechanically. In wet, dirty, dusty, corrosive or similar locations, all fittings must be
properly tightened and secured such that no leakage can occur.
BRAKE RES
MOTOR
R+
R- T1/U T2/V T3/W
UDC+
3a
MOTOR
BRAKE
RES
R+
R-
T1/U
T2/V
T3/W
UDC+
3a
Conduit
Terminal data for power
R1...R2 with disconnect
INPUT
PE
L1 L2 L3
3b
1
R3 with disconnect
3b
PE
INPUT
L1
L2
L3
1
Note 1: Internal fuse block is wired between the disconnect and the
drive
connections.
.
When an
BRAKE RES
MOTOR
R+
R- T1/U T2/V T3/W
UDC+
3a
BRAKE RES
MOTOR
3a
R+
T1/U
T2/V
T3/W
R-
UDC+
5