Receiving & Inspection:
1.
Carefully unpack the Cool Lube 2 system. Inspect the
system for any damage during shipping.
2.
Report any damage to the carrier for claims.
3.
Make sure that available voltage supply is within 10% of the
system voltage.
4.
Check all hydraulics to ensure that nothing came loose
during shipping. Tighten as needed.
5.
Changes to this unit may void the warranty.
Figure 1 - Cool Lube 2
FLOW
METERS
Figure 2 - Controls
Installation Instructions:
1.
Place the unit in the designated area and anchor it down
using the 4 mounting holes in the base plate. The unit
should be positioned below the circulating oil drain holes
in the bearings so that at least a 15° drain line slope is
achieved to allow for adequate oil return.
2.
Make sure that there is enough space around the unit to
allow for servicing.
3.
Connect oil supply lines (not included) from the two 1/2"
NPT (female) outputs of the flow meters to the circulating
oil inlets on the housings.
4.
Connect oil return lines (not included) from the circulating
oil drain holes in the bearing housings to the 1" NPT
(female) returns on the Cool Lube 2 reservoir.
NOTE: All plumbing should be cleaned and flushed
before being connected to the bearings.
NOTE: Drain piping should be vented and as large as
possible to drain oil from the bearings at the same rate
as the incoming oil flow. The circulating oil drains must
be directed straight down into a return drain sloping
away at a 15° or greater angle.
5.
Fill up the Cool Lube 2 reservoir with clean oil by
monitoring the oil level gauge on the tank. The reservoir will
hold 5 gallons of oil.
Electrical Hook Up:
Connect the two electric motors to a power supply through the
proper fuses, starters and overload protection using NEC and
local electrical codes.
Optional Heater/Thermostat Assembly:
260W X 120V, 1 PH—Part # 434725
260W X 240V, 1 PH—Part # 434726
Optional Temperature/Oil Level Switch:
Part # 434941. Connects to a control system (not provided by
Dodge) in order to monitor oil level and temperature.
Replacement Filter:
Use replacement oil filter Part # 078358
Optional Filter Additions:
Operating Instructions:
1.
2.
BEARING
PRESSURE
GAUGE
3.
NEEDLE
VALVES
4.
PUMP
PRESSURE
GAUGE
5.
6.
7.
8.
9.
10. Check oil level in the tank. The oil level will go down as the
11. Once the flows to the bearings are confirmed, the unit is
12. Monitor the pressure gauges and oil level closely the first
13. To change the filter while the unit is running, pull and rotate
2
Duplex filter head with two filters
Water absorbing filter with moisture absorbing capability
can be added in series after the standard filter.
Observe the oil level gauge on the tank to ensure that oil is
at the proper level.
Quickly jog both motors on and off to see if they are
rotating in the correct directions (reference the rotation
arrows on top of the motors). Correct the wiring if
necessary. (Reverse direction will cause damage to the
pump.)
Before starting the Cool Lube 2, jog the pump motor four or
more times to prime the pump.
Start the Cool Lube 2 and allow the oil to circulate. Be sure
to monitor the oil level in the tank to ensure that the oil
returns from the bearing housings. If air in the return lines
becomes a problem, it may be necessary to bleed the air
out of the lines by loosening a fitting close to where the
problem is.
Visually check the system for leaks and correct if
necessary.
Confirm that there is flow by using the flow meters. If there
is no flow, check for leaks.
Adjust the oil flow rates to desired flow by adjusting the
needle valves while observing the flow meters (See Figure
2). To adjust the needle valves, first loosen the locknut, then
use an Allen wrench to open and close the valves. Make
sure that the pump pressure does not exceed 200 psi by
watching the system pressure gauge.
Make sure there are no leaks of any kind.
Turn off the pump.
oil fills the bearing lines. If the lines are lengthy, additional
oil may be needed to restore the proper level.
ready for operation.
few hours of operation.