Miller ArcReach SuitCase 12 소유자 매뉴얼 - 페이지 27
{카테고리_이름} Miller ArcReach SuitCase 12에 대한 소유자 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Miller ArcReach SuitCase 12 48 페이지.
6-2. Cable Length Compensation (CLC)
Notes
.
CLC will only work with a compatible
power source.
.
Having a good clean connection with the
v-sense clamp will ensure CLC works
properly.
1
Cable Length Compensation (CLC)
Indicator
Cable Length Compensation (ON)
After the feeder associates (see Section 5-3)
to the power source, CLC will appear in the
voltage display on the feeder. This indicates
the feeder is calculating for CLC. Within 5−10
1
seconds, preset voltage will appear on the
voltage display along with the CLC indicator
turning on.
Only the desired weld voltage needs to be
preset at the feeder without any manual com-
pensation for voltage loss in the weld cables.
While welding the power source will auto-
matically adjust it's voltage to compensate
for any voltage drop in the weld cables.
.
If the feeder is unable to calculate CLC
the indicator will flash. If this happens a
weld can be made and the CLC will be
calculated in the first few seconds of the
weld. The first few seconds of welding
may be erratic due to the feeder calculat-
ing CLC.
Turning Cable Length Compensation
ON/OFF
S
.
Press and hold the Voltage Adjust knob
and the Wire Feed Speed adjust knob si-
multaneously.
S
.
P01 (P01 = CLC) will appear on the volt-
age display with either On or Off being
displayed on the wire feed speed/amps
display.
.
Within 3 seconds, turn the Wire Feed
S
Speed adjust knob to toggle between On
and Off.
S
.
When turned to On, the CLC indicator
will turn on within 3−5 seconds.
S
.
When turned to Off, the CLC indicator
will turn off.
Ref. 278794-A
OM-278792 Page 23