Miller Axcess 675 소유자 매뉴얼 - 페이지 22

{카테고리_이름} Miller Axcess 675에 대한 소유자 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Miller Axcess 675 48 페이지. Automatic welding interface and arc welding power source
Miller Axcess 675에 대해서도 마찬가지입니다: 소유자 매뉴얼 (48 페이지)

SECTION 5 − RECOMMENDED SETUP PROCEDURES

5-1. Selecting Weld Cable Sizes*

NOTICE − The Total Cable Length in Weld Circuit (see table below) is the combined length of both weld cables. For example, if the power source is
100 ft (30 m) from the workpiece, the total cable length in the weld circuit is 200 ft (2 cables x 100 ft). Use the 200 ft (60 m) column to determine cable
size.
Weld Output Terminals
!
Turn off power before
connecting to weld out-
put terminals.
!
Do not use worn, dam-
aged,
undersized,
or
poorly spliced cables.
Positive
Negative
*
)
Ref. 803 824-A
This chart is a general guideline and may not suit all applications. If cable overheating occurs, use next size larger cable.
*
**Cable should be sized for Peak Amperage (Apk) for pulse welding applications.
***Weld cable size (AWG) is based on either a 4 volts or less drop or a current density of at least 300 circular mils per ampere.
2
( ) = mm
for metric use
****For distances longer than those shown in this guide, call a factory applications representative at 920-735-4505.
.
In pulse welding applications using inverter power sources, peak currents can result in extreme voltage drops producing poor welding characteris-
tics with undersized cables. A recommendation for weld cable size is a minimum of 2/0 for 300 ampere welding power sources and 4/0 for 450
ampere welding power sources when total cable length is less than 100 ft (30m).
OM-217 751 Page 18
Weld Cable Size*** and Total Cable (Copper) Length in Weld Circuit Not Exceeding****
100 ft (30 m) or Less
Welding
10 − 60%
60 − 100%
Amperes**
Duty Cycle
Duty Cycle
100
4 (20)
150
3 (30)
200
3 (30)
250
2 (35)
300
1 (50)
1/0 (60)
350
1/0 (60)
2/0 (70)
400
1/0 (60)
2/0 (70)
500
2/0 (70)
3/0 (95)
600
3/0 (95)
4/0 (120)
2 ea. 2/0
700
4/0 (120)
2 ea. 2/0
800
4/0 (120)
2 ea. 2/0
2 ea. 3/0
900
(2x70)
2 ea. 2/0
2 ea. 3/0
1000
(2x70)
2 ea. 3/0
2 ea. 4/0
1250
(2x95)
(2x120)
150 ft
200 ft
(45 m)
(60 m)
4 (20)
4 (20)
3 (30)
3 (30)
2 (35)
1 (50)
2 (35)
1 (50)
1/0 (60)
1 (50)
1/0 (60)
2/0 (70)
2/0 (70)
3/0 (95)
4/0
3/0 (95)
(120)
4/0
3/0 (95)
(120)
4/0
2 ea. 2/0
(120)
(2x70)
2 ea. 2/0
2 ea. 3/0
(2x70)
(2x95)
2 ea. 3/0
2 ea. 4/0
(2x70)
(2x95)
(2x120)
2 ea. 3/0
2 ea. 4/0
(2x70)
(2x95)
(2x120)
2 ea. 4/0
3 ea. 3/0
(2x95)
(2x120)
(3x95)
2 ea. 4/0
3 ea. 3/0
(2x95)
(2x120)
(3x95)
3 ea. 3/0
4 ea. 3/0
(3x95)
(4x95)
250 ft
300 ft
350 ft
(70 m)
(90 m)
(105 m)
10 − 100% Duty Cycle
2 (35)
1 (50)
1/0 (60)
1/0 (60)
2/0 (70)
3/0 (95)
4/0
2/0 (70)
3/0 (95)
(120)
4/0
2 ea. 2/0
3/0 (95)
(120)
(2x70)
4/0
2 ea. 2/0
2 ea. 3/0
(120)
(2x70)
(2x95)
2 ea. 2/0
2 ea. 3/0
2 ea. 3/0
(2x70)
(2x95)
(2x95)
2 ea. 2/0
2 ea. 3/0
2 ea. 4/0
(2x70)
(2x95)
(2x120)
2 ea. 3/0
2 ea. 4/0
3 ea. 3/0
(2x95)
(2x120)
(3x95)
2 ea. 4/0
3 ea. 3/0
3 ea. 4/0
(2x120)
(3x95)
(3x120)
3 ea. 3/0
3 ea. 4/0
3 ea. 4/0
(3x95)
(3x120)
(3x120)
3 ea. 4/0
3 ea. 4/0
4 ea. 4/0
(3x120)
(3x120)
(4x120)
400 ft
(120 m)
1/0 (60)
3/0 (95)
4/0
(120)
2 ea. 2/0
(2x70)
2 ea. 3/0
(2x95)
2 ea. 4/0
(2x120)
2 ea. 4/0
(2x120)
3 ea. 3/0
(3x95)
3 ea. 4/0
(3x120)
4 ea. 4/0
(4x120)
4 ea. 4/0
(4x120)
S-0007-E