Miller ICE-25CX 소유자 매뉴얼 - 페이지 3

{카테고리_이름} Miller ICE-25CX에 대한 소유자 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Miller ICE-25CX 38 페이지. Air-cooled torches for plasma arc cutting

Miller ICE-25CX 소유자 매뉴얼
4.
Installing 12 Ampere Torch And Work Cable, And Using Trigger Safety Lock
6
5
4
3
4
Tools Needed:
5/8 in
4
7
1
2
2
5
8
6
Trigger Locked
5
8
6
3
9
Trigger Unlocked
Ref. 801 300-B / Ref. 802 464 / 199 088 / 801 545-A
If torch or work cable needs to be
removed or replaced, proceed as
follows:
!
Turn
power
Off,
and
disconnect input power plug
from receptacle.
Remove wrapper from unit.
Torch Connections
Remove existing torch cable from
unit.
1
Strain Relief
2
Torch Cable
Insert cable through strain relief.
Slide strain relief nut onto torch
cable, but do not tighten.
3
Air Line Connector
Install air line connector onto
compressor fitting.
4
Plug PLG4/Receptacle RC4
Connect PLG4 to receptacle RC4
on circuit board PC1.
5
Female And Male Friction
Terminal RC11/ELECT
WHITE
Connect female friction terminal on
end of white leads to RC11/ELECT
WHITE.
6
Female And Male Friction
Terminal RC7/PILOT RED
Connect female friction terminal on
end red leads to RC7/PILOT RED.
Tighten strain relief nut.
Tighten strain relief around cable.
Work Cable Connections
Remove existing work cable from
unit.
7
Strain Relief
.
Be sure to allow some work
cable slack inside the unit.
Insert work clamp lead through
strain relief, and install strain relief
into front panel.
8
Work Lead Male Friction
Terminal
Connect work clamp lead to male
friction terminal labeled WORK
LEAD on circuit board PC1. Route
lead along torch lead bundle.
9
Trigger
801 423 / Ref. 801 300-B
OM-1593 Page 3