ABB ENTELLIGUARD G 매뉴얼 - 페이지 14
{카테고리_이름} ABB ENTELLIGUARD G에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. ABB ENTELLIGUARD G 17 페이지. Procedure for quality checks of dr iec
CHECKS BEFORE LOADING THE BREAKER
1.VISUAL CHECK ON FIXED PORTION BEFORE LOADING THE BREAKER
A. Ensure that the front display panel of the cassette shows disconnected position as shown below
DISCONNECT
2.Visually check presence and proper mounting of all the parts and assemblies in the fixed portion as per
instruction sheet.
Rev. A
PROCEDURE FOR QUALITY CHECKS OF
DR IEC ENTELLIGUARD G FAMILY
Doc.N°
Page N°
1SDH00XXXXX
14/17