Chromalox RTPC 설치 지침 매뉴얼 - 페이지 5

{카테고리_이름} Chromalox RTPC에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Chromalox RTPC 8 페이지. Power connection kit for self-regulating & constant wattage heating cables
Chromalox RTPC에 대해서도 마찬가지입니다: 설치 지침 (4 페이지)

Chromalox RTPC 설치 지침 매뉴얼
Cable installation instructions: CPR, CPM, CZH, SRL, SRM/E, SRP
CWM cable special instructions denoted by *
1. Punch out the knockouts on the bottom of the
box which correspond to the openings in the base
through which the heating cable passes. Only
punch out the knockouts that are to be used. If one
is mistakenly punched, blank grommets can be or-
dered to re-establish the water tight seal.
3. Slide cable grommet over the end of the cable and
insert it into the opening in the base. Secure the
base to the pipe by threading the appropriate sized
pipe strap through the slot in the mounting plate.
Tighten the pipe strap until the base is securely at-
tached to the pipe.
2. Feed the ends of the cables through the appropri-
ate hole in the base. Allow 8 inches of cable to ex-
tend above the top of the base.
4. Score the outer insulation 7 inches from the end of
the cable. Remove the jacket to expose the metal
braid. CAUTION: When removing outer jacket, be
careful not to damage the braid of the base cable
insulation. NOTE: If using braid only cable (-C) skip
this step.
5