Diamond BCC/10 서비스 지침 - 페이지 13
{카테고리_이름} Diamond BCC/10에 대한 서비스 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Diamond BCC/10 14 페이지. Usb blast chiller & freezer
9
Data logger COP_UI40 COMUNICATION ERROR
9.1 Comunication error with the main power.
Verify that the green and orange led ( LD 8 and LD 12) are blinking together with the unit ON.
If the green led is blinking and the orange is OFF, the power board must be changed since it is not
responding.
If the orange led is blinking and the green one is OFF, the user interface must be changed.
9.2 if the LED 1 blinking RED when there is the microprocessor is working
9.3 if the LED 7 is RED fix theBoard COP_UI40 is supplied
LED 12
LED 8
LED 1
LED 7
13
ed. 0116 rev. 00