Burlington chaplin r12 chr 설치 지침 - 페이지 3

{카테고리_이름} Burlington chaplin r12 chr에 대한 설치 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Burlington chaplin r12 chr 5 페이지.

Heated with the central heating system
Parts required:
The diagrams of control valve and the connecting pipe as shown above are for reference only, and
should be purchased separately.
4
6
2x
5
After installation ...
● Use a screwdriver to open the air vent,
open the inlet valve and let the water rush
into the radiator. Check all connections for
leaks.
● Once water overflows from the air vent,
there is no air in the tube, use a screwdriver
to close the air vent. Turn on the outlet valve
and the radiator is ready for use.
3 - 5
2x
B