Aquasana EQ-WELL-UV 설치 지침 매뉴얼 - 페이지 5
{카테고리_이름} Aquasana EQ-WELL-UV에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Aquasana EQ-WELL-UV 12 페이지. Whole house well water filter
Installation
1. KEEP THE UNIT IN AN UPRIGHT POSITION AT ALL TIMES.
2. Remove the red shipping caps from the inlet & outlet ports on the main housing.
3. Precondition the unit by "surge flushing": It is very important that this system is flushed
properly prior to final installation. The granular carbon medium used in the bottom tank
contains 1-2% by volume of carbon fines that should be flushed out prior to use. The best
method for purging these carbon fines from the media bed is "surge flushing":
Using the supplied adapter, connect a garden hose to the
inlet port so that the water will flow into the system and
out of the outlet port. Slowly turn on the water and allow
the discolored water to flow from the outlet into a bucket
or drain. The first few gallons will appear black and cloudy
due to carbon fines. After an initial 15 minute flushing, begin
a period of "surge flushing." Turn the water supply on for
30 seconds and then off for 30 seconds repeatedly for 15
minutes or until initial surge of water is completely clear
and free from discoloration and cloudiness. Once the unit
has been properly flushed, be sure the white washers are
properly set inside the inlet and outlet ports. Disconnect it
from the garden hose and position it for final installation.
4. Turn off main source water supply prior to installation.
5. Install the unit to the main water supply using the supplied components. Do not over tighten
fittings, as this may cause leakage and broken fittings. Do NOT use pipe dope. The use of
pipe dope voids the warranty. You may use NSF-certified pipe primer, glue and plumber's
tape. Leave two-three threads exposed and do not exceed seven layers of plumber's tape.
More than seven layers will cause the nipple to crack and leak.
6. IMPORTANT: The inlet piping assembly (valve, pre-filter, main filter unit, union and nipples)
must be firmly braced and supported. Support bracket for Pre/Post filter housing included.
7. Once installation is complete, slowly turn the water on and inspect for leaks.
8. Once the unit is installed and checked for leaks, open the water faucet closest to the
installed unit and allow water to run for 5-10 minutes for the final flushing period.
LICENSED PLUMBER TO VALIDATE THE WARRANTY
– check operating specifications before installing
THIS UNIT MUST BE INSTALLED BY A