AquaScape 99774 지침 및 유지 관리 - 페이지 7
{카테고리_이름} AquaScape 99774에 대한 지침 및 유지 관리을 온라인으로 검색하거나 PDF를 다운로드하세요. AquaScape 99774 16 페이지.
AquaScape 99774에 대해서도 마찬가지입니다: 지침 및 유지 관리 (16 페이지)
STEP 7
BUILD THE RETAINING WALL
• Finish off the berm where the BioFalls is buried by building
a small retaining wall out of boulders (Ex. 17). This step
may or may not be needed, depending on the size of the
berm and the transition into the existing landscape.
STEP 8
PLUG IN AND TWEAK THE WATERFALLS
• As soon as the pond is filled and all of the Pond and
Waterfall Foam is dry, you may plug the pump in and test
the waterfall.
WARNING: Any electrical should be plugged
into a GFCI rated receptacle.
• You can tweak the waterfall flow by placing smaller stones
and gravel on the waterfall cascades. This will change the
appearance and sound of the water. Have fun playing with
the flow of water coming over the falls until you achieve
the desired effect.
STEP 9
TRIM THE LINER
• With everything running, go around the perimeter of the
pond with a pair of scissors and trim off any excess liner,
always leaving several inches above the water level as
a precaution (Ex. 18). The remaining liner edges can be
covered with gravel (Ex. 19).
Ex. 18
☎
aquascapeinc.com |
CAN (866) 766-3426 |
STEP 10
MULCH THE BERM
• The entire area surrounding
the BioFalls can now be
mulched and any
surrounding plants added
(Ex. 20).
Ex. 17
Ex. 19
☎
US (866) 877-6637
WARNING: Do not trim the liner until the
waterfall is running and the pond is filled to the
desired level. Prematurely trimming the liner
may cause leaks.
Ex. 20
7