Planning the configuration
Before installing the switch, analyze the servers and storage and develop
a plan for controlling access to the storage. After installing the switch,
configure the switch and the storage per the plan
switch
" on page 3).
Selecting the interconnect bay
Each c3000 and c7000 interconnect bay maps to servers via the slot
in which the mezzanine cards are installed in the server blades. When
selecting interconnect bays for switches, make sure that the selected
bays map to the desired server blades. For information about mappings,
see the user documents for your c-Class enclosure model. For information
about supported mezzanines, see the 3Gb SAS Switch QuickSpecs.
IMPORTANT:
This switch is supported for use in both single- and dual-domain
environments. When used in dual-domain configurations, the
two switches must be installed in the same row of the c-Class
enclosure.

Installing the switch

NOTE:
The 3Gb SAS Switch may be hot-installed in an operational
enclosure.
Make sure that the mezzanine cards are installed in server
mezzanine slots that map to the selected c-Class enclosure in-
terconnect bay.
The 3Gb SAS Switch does not have a power on/off button.
Power is automatically applied or removed when the switch
is installed or removed from the enclosure. Alternatively, power
can be applied or removed through the Onboard Administrator
application.
Connect SAS cables to external storage enclosures only after
confirming that the desired firmware version is installed on the
switch.
For illustration purposes, the following images demonstrate installing a
3Gb SAS Switch in interconnect bay 5 of a BladeSystem c7000
enclosure.
1.
("Configuring the
2.
3.
Page 2
Remove the air baffle from the selected interconnect bay.
Prepare the switch.
Install the switch in the open interconnect bay.
When installed in an operational enclosure, the switch automatically
powers up and performs a series of Power On Self Tests.
A successful installation is indicated by a green Health LED
panel and LED
definitions" on page 1). If the Health LED is amber
or there is no power to the switch, see the "Troubleshooting" section
of the HP BladeSystem enclosure setup and installation guide.
("Front