Panasonic PT-F200U 설정 및 운영 매뉴얼 - 페이지 33
{카테고리_이름} Panasonic PT-F200U에 대한 설정 및 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Panasonic PT-F200U 37 페이지. Panasonic pt-f200: product brochure
Panasonic PT-F200U에 대해서도 마찬가지입니다: 브로셔 및 사양 (6 페이지)
Operation Instructions (1
Operation Instructions (1
Scheduling Function
Scheduling Function
1
1.
In the group/keyword tree view pane, select the icon of a group/keyword/projector to be programmed for a
scheduled operation, and perform either (a) or (b).
(a) Right-click the selected icon, and select Schedule in the context menu
(b) Select File → Schedule on the menu bar.
2.
To add a new schedule, click Add. To correct or change an existing schedule, select that schedule and click Edit
(2
in the above diagram).
3.
Create a schedule and click OK
Setting items
4.
The set command is executed at the specified time (PC clock time). The results will be displayed in the command
execution log pane
(4
Temporarily disables the
scheduled operation.
4
* Schedules indicated in the Set Position section cannot be modified.
(3
in the above diagram).
Command start time: Specified date/Everyday/Weekly (multiple days of the week can be specified) + Time
Control command: Power ON/OFF, AV Mute ON/OFF, input terminal switching (one each, sequence can be changed)
in the above diagram).
0
)
0
)
2
(1
in the above diagram).
3
33