DISCHARGE PUMP
line (from step 9) to exit the tank. This exit point MUST NOT be any higher than five feet above the pump. It
is preferred that this exit point be placed in the manhole access.
19. Outside of the treatment tank the discharge may be increased in size. Make connections from the treatment
tank exit to the final discharge tank/method. The discharge line MUST NOT increase in elevation in reference
to its exit point from the treatment tank.
20. Install a vent line on the Discharge Pump by solvent welding ¾" Ø PVC pipe to the opposite side of the PVC
Tee (see #20 in above picture). Vent line must terminate in the access riser for easy use. See step 22.
VENTING
21. The ¾" [19 mm] vent/Clean In Place (CIP) line for the discharge pump (connected in step 20) should be
terminated with a ball valve in the manhole in a location that is easy to reach. Make sure the ball valve is in
the CLOSED position until the tank is to be filled with water (see FINAL INSPECTION & STARTUP).
22. A treatment tank aeration vent must be installed in the manhole riser. This vent must be at least 4" diameter
[101 mm] and must drain all moisture that will build up in the vent. The vent opening must contain at least 7.1
in2 [45.8 cm2] open surface area and be properly secured to prevent unauthorized access. The vent line
MUST NOT allow excess moisture nor back pressure to build up.
16. Residential BioBarrier® - The Discharge Pump, pump vent line, and discharge
tubing MUST be assembled at the job to prevent shipping damage.
17.
Pump fittings:
a.
NOT glue Tee to pump intake.
b.
pipe into Tee (see picture).
c.
Connect and clamp 1" ID x 3.5" L flex tubing to PVC pipe from previous
step (16b). Firmly tighten the clamp to between 2 – 10 ft-lbs of torque. DO
NOT crack the PVC pipe.
d.
Connect and clamp ½" ID x 10' L flex tubing to the threaded pump discharge.
Firmly tighten the clamp to between 2 – 10 ft-lbs of torque. DO NOT crack the
pastic pump nipple.
e.
Connect and clamp 1" ID x 3.5" L flex tubing and entire pump assembly to
BioBarrier outlet nipple.
18.
Make connections in the treatment tank manhole for the 5/16" [8 mm] discharge
If you have any questions