Alpha ESS SMILE-BAT-10.3P 빠른 설치 매뉴얼 - 페이지 4
{카테고리_이름} Alpha ESS SMILE-BAT-10.3P에 대한 빠른 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Alpha ESS SMILE-BAT-10.3P 12 페이지. Battery module
Alpha ESS SMILE-BAT-10.3P에 대해서도 마찬가지입니다: 빠른 설치 매뉴얼 (7 페이지), 빠른 설치 매뉴얼 (5 페이지)
Open Maintenance Window
Open the front panel and the battery maintenance panel, turn off
the battery circuit breaker.
Open the communication panel on the right side, you will see the
EMS communication board and battery communication board.
Turn off the battery
circuit breaker
Communication Cable Wiring
Connect the communication cables from the EMS/battery
communication board to the other devices.
OFF
ON
1. Meter, please read electricity meter
wiring instructions
2. LAN, establish a wired connection to the
local network (e.g. via a router)
3. LAN, establish a wired connection to the
local network (e.g. via a router)
4. BMS, communication connection for
battery expansion
Maintenance Window for
Battery Circuit Breaker
Battery Communication Board
EMS Communication Board
Standard Configuration: 1x
Communication Cable 1
Installation Method of
Communication Cable
via M25 Cable Gland