EPHREM LE NOMADE 120 조립 지침

{카테고리_이름} EPHREM LE NOMADE 120에 대한 조립 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. EPHREM LE NOMADE 120 2 페이지.

L E N O M A D E 1 2 0
A
D
B
• 10 cm breeze blocks for the insulation with
vermiculite concrete (load bearing slab:
L166xD151)
• 20 cm breeze blocks for the insulation with
rock/ceramic wool + sand (load bearing slab:
L186xD161)
20cm breeze
blocks
EXPLODED VIEW
WARNING: DO NOT USE ALCOHOL, GASOLINE, OR SIMILAR FLAMMABLE LIQUIDS TO IGNITE OR REKINDLE THE FIRE
24
C
Total weight: 430 kg
Packaged on a pallet
measuring 110×130 cm
15 to 20 cm thick above
the dome
Dry sand
Rock wool in flexible rolls
The combination of rock
wool + sand can be
replaced by vermiculite
concrete)
20 cm load
bearing slab
Layer of lean mortar
(non-refractory)
1 dose of normal
cement to 6 doses
of 0/4 mm sand.
A S S E M B LY I N S T R U C T I O N S
34
15
26
4
54
134
Step 1:
Trim elements if needed with a wood rasp.
Step 2:
Build a concrete slab
for insulation with vermiculite concrete) and let it dry for at least 22 days. Create a thin bed
of
lean mortar
(2 to 3 cm thick) using standard cement
depicted in figure 1 to place the 22 base slabs
mortar bed. Make sure they are properly aligned and that the top surface is leveled. No
joint mortar is required. Remove any excess mortar from around the base.
to dry for 24 to 48 hours before proceeding.
Step 3:
Position the front element
②, ③, ④,
install the elements
below or between these elements. Fit the element
with the center of part ①. Secure the metal strapping to the base of element
bolts
and tighten them
other.
Step 4:
Build a wall surrounding the oven using breeze blocks that are 20 cm thick (10 cm
for insulation in vermiculite concrete). Make sure to leave a 5 cm gap between the slabs
and the breeze blocks to allow for expansion.
Step 5:
Position the smoke drain-façade
indicated. Be cautious not to overtighten the bolts; tighten them fully with a spanner and
then unscrew them by half a turn.
Step 6:
Assemble the 200 mm stainless steel flue pipe and connect it to the designated
space ⑫. Ensure a secure fit and seal the connection using
Step 7:
Surround the entire oven with a 10 cm flexible roll of rock/ceramic wool or of
EPHREM insulating fibre (available as an option). Cover the insulation with 0/4 dry sand or
vermiculite concrete, ensuring it reaches a minimum height of 20 cm above the dome
Step 8:
Leave an air gap of 20 cm between the roof and the top of the oven insulation to
create a decompression chamber. Additionally, insulate the load-bearing slab from
underneath with a single rigid panel of at least 5 cm thick rock wool. Finally, build the
desired cladding to complete the installation.
134
measuring at least W195xD165x20 cm (W175xD155x20
⑨.
Follow the configuration
moistened beforehand on top of the
according to the provided diagram. Proceed to
and
in the specified order, ensuring there are no joints
without a joint, aligning the mark
to ensure a snug fit of the oven side elements against each
and secure it in place using the four bolts
refractory
Allow the floor
using the
as
mastic.
⑬.