Olympus BH2-CH Substage 어셈블리 - 페이지 13

{카테고리_이름} Olympus BH2-CH Substage에 대한 어셈블리을 온라인으로 검색하거나 PDF를 다운로드하세요. Olympus BH2-CH Substage 26 페이지.

Olympus BH2-CH Substage 어셈블리
Figure 34 – Remove centering plunger from the bore

Reassemble the Centering Plunger

Use a cotton swab wetted with a suitable solvent (e.g.,
acetone) to clean any old grease from the plunger and
spring. Also clean the bore in the condenser slide, the
face of the dovetail slide, and the bearing surfaces on
the face and bevels of the dovetail slide (see
Figure 35 – Clean grease from bore and dovetail slide
Apply fresh grease to the centering-plunger bore in the
condenser slide (see
Figure
Figure 36 – Apply grease to the centering-plunger bore
Insert the centering plunger, with attached c-clip, into
the centering-plunger bore in the face of the dovetail
slide (see
Figure
37).
Complete Teardown, Cleaning/Lubrication, and Reassembly of the Olympus BH2-CH Substage Assembly
Figure
36).
Figure 37 – Reinstall plunger and c-clip into bore
Insert the plunger-extension spring into the centering-
plunger bore in the face of the dovetail slide (see
38).
35).
Figure 38 – Reinstall plunger-extension spring into bore
Compress the extension spring and reinstall the
plunger-retaining screw into the bore of the dovetail
slide, to retain the extension spring and centering
plunger (see
Figure 39 – Reinstall the plunger-retaining screw
Use a suitable slotted screwdriver to tighten the
plunger-retaining screw such that the head of the screw
is slightly recessed relative to the face of the dovetail
slide (see
Figure 40
screw from interfering with the mounting of the plastic
condenser-height rack. Wipe off any grease pushed out
by the plunger.
Figure
39).
and
Figure
41). This will prevent the
Revision 1
Figure
Page 13 of 26