AlphaESS SMILE-G3-S3.6 하드웨어 커미셔닝 - 페이지 9

{카테고리_이름} AlphaESS SMILE-G3-S3.6에 대한 하드웨어 커미셔닝을 온라인으로 검색하거나 PDF를 다운로드하세요. AlphaESS SMILE-G3-S3.6 18 페이지.

Commissioning Procedures
 Switch on the PV switch on the energy storage inverter if there is any and AC
breaker on the PV-inverter if there is any.
 Switch off all the loads to see the battery charging status and the inverter LED
("SYSTEM")* will be solid on green. Battery power value should be negative. If the
system is in AC or hybrid mode, the PV inverter power value should be positive. If
it is not normal, please check the direction of PV CT or PV meter installed.
DC Mode
1.3.2.3 Check the UPS State
 Please connect an essential electrical appliance to the socket of backup load. Or
switch on an essential electrical appliance already connected on the backup load
port of the inverter.
 Switch on the AC breaker on the backup port of the energy storage inverter.
 Switch off external AC breaker between the grid and the energy storage inverter.
 The inverter will enter the UPS mode at once.
AC Mode
Hybrid Mode
9