ABB ACH550 series 빠른 시작 매뉴얼 - 페이지 2
{카테고리_이름} ABB ACH550 series에 대한 빠른 시작 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. ABB ACH550 series 6 페이지. Pumpsave 4.1, energy savings calculator for pump drives
ABB ACH550 series에 대해서도 마찬가지입니다: 사용자 설명서 (14 페이지), 설치, 운영 및 유지보수 매뉴얼 (18 페이지)
4.
ACH550 Control Panel (ACH-CP-B) & Ethernet Cable – For Control Panel (ACH-CP-B) Interface to control board
(SMIO-01).
5.
OPCA-01 (DB9 to RJ45 Connector), USB to 232 Connector, & Computer with Drive Windows Light – For Drive
Windows Light interface to control board (SMIO-01). Note that this hardware is only required if using Drive
Windows Light in place of the control panel.
Existing installation board recovery & interface board installation instructions
*Before you begin, ensure that the lock out tag out procedures have been completed and that there is no power to the
work area or drive. Later follow proper ESD (electrostatic discharge) guidelines when working with the bare circuit
boards.
Step 1: Remove existing panel if installed.
Step 2: Remove existing mounting screw and remove cover by pushing tabs at the side of the cover and lifting and
pulling forward.
LVD-EOTKN094U-EN REV A
Effective: 2022-06-30
2