ABB ACS350 Series 설치 지침

{카테고리_이름} ABB ACS350 Series에 대한 설치 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. ABB ACS350 Series 4 페이지. Nema 1 series enclosure kit for abb acs150; abb acs350
ABB ACS350 Series에 대해서도 마찬가지입니다: 설치 지침 (2 페이지), 사용자 설명서 (14 페이지), 설치 지침 (4 페이지), 설치 지침 (4 페이지)

ABB ACS350 Series 설치 지침
ACS310, ACS320, ACS350 and ACS355
MUL1-R4 Installation Instructions
WARNING! Before installing MUL1-R4
option, read the safety instructions and
mechanical and electrical installation
instructions in the drive User's Manual.
Follow the instructions when installing,
operating and servicing the drive. If
ignored, physical injury or death may
follow, or damage may occur to the
drive, motor or driven equipment.
Note: You cannot lead the Safe torque off (STO) cable
through the gland plate in the ACS355.
3. If control cables or fieldbus option modules will be installed,
remove the detachable lid (3) from the gland box cover.
M4×8
1. Fasten the gland box frame to drive with two M4×16 screws
and one M4x8 screw. Note: The M4×8 screw is already
installed in the drive.
3
4. With any fieldbus option module except FRSA-00, install the
option grounding plate to the gland box frame. See Mechanical
installation in the drive manual.
© 2010 ABB Oy. All Rights Reserved.
1
1
2. Fasten the gland box frame to wall with four M4 screws (not
included).
4
5b
5. Install the clamp (5a) for the control cable, or if cables are run
in conduits, replace all clamps with suitable glands (not
included). Run cables through the clamps and tighten. Strip
cable ends. Fasten the grounding conductor (PE) of the input
g
power cable and the twisted shield of motor cable under the
grounding clamps (5b). Connect the conductors to appropriate
terminals. See Electrical installation in the drive manual.
3AUA0000025916 Rev. C / 2010-01-25
2
5a
g
(
)
p