aXtion pro MP 매뉴얼 - 페이지 2
{카테고리_이름} aXtion pro MP에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. aXtion pro MP 4 페이지. For surface go
Installation Guide
Place water test paper inside,
face down to the front of case/
screen side.
Test under 12" of water for 10 minutes
12 in
12 in
30 cm
30cm
>
2 lbs
pro MP | MPA
Open the latches...
1
3
10 min
5
Ensure the O-ring is seated into
the channel around the case.
Close the case. Ensuring all latches are
completely closed.
Dry the outer case prior to opening and ensure the water test
paper is dry.
for
Surface
Go
O-ring
2
4
6