AYC Group LS-5000B 소유자 매뉴얼 - 페이지 4

{카테고리_이름} AYC Group LS-5000B에 대한 소유자 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. AYC Group LS-5000B 9 페이지.

AYC Group requires that you contact a local, qualified plumber to install your new
AYC Group pedicure spa. It cannot operate properly or safely unless it is provided
with adequate electrical power, sufficient water pressure, proper water temperature
and the required drain facilities. Information on these important subjects is
contained in this manual. We urge you to read it carefully to make sure these
requirements are met.
1. Excessive water temperature is dangerous and should be checked before use.
Maximum operating water temperature should not exceed 100 F˚ (38 C˚) and the
maximum supply water temperature should not exceed 125 F˚ (65 C˚).
2. Always enter and exit the pedicure spa slowly and carefully.
3. Never bring and/or operate any electrical devices into or near the spa.
4. Do not stand in the whirlpool tub!
Installation Summary
The installation must comply with all plumbing and electrical codes. A licensed plumber
should complete the plumbing of the spa.
Note: Failure to comply with federal, state or local codes and ordinances will result in
warranty being null and void.
Select a level location where the floor structure beneath the spa is capable of supporting
the occupied spa.
For the seat back to fully recline, the spa base must be placed a minimum of 20 inches
from the wall.
Connect the water supply lines with cold and hot inputs.
Connection: Cold
Attach the P-trap to the bottom of the drain with the retaining nut. Be sure to place the
gasket between the brass drain and the P-trap.
Drain and Water inputs
½ NPT
Hot
½ NPT