CREE LIGHTING 304 Series 설치 지침 - 페이지 3

{카테고리_이름} CREE LIGHTING 304 Series에 대한 설치 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. CREE LIGHTING 304 Series 3 페이지. Recessed canopy petro box retrofit

CREE LIGHTING 304 Series 설치 지침
6
STEP 6:
For (B)XCR (227 Series):
Make wiring connections using min. 90C
wire connectors (supplied by others). Ground connection should include
previous luminaire ground as well as ground from retrofit panel.
STEP 7:
For (B)XCP (304 Series):
Connect the cord to the supply wiring. Verify
that the supply voltage is within the fixture's voltage rating. Locate the
electrical supply wiring in the ceiling junction box. Connect the supply
wiring to the fixture's supply cord as follows:
Ground
(green) to green conductor
Line
(black) to black conductor
Neutral
(white) to white conductor
ELECTRICAL CONNECTIONS
STEP 1:
Using 90°C minimum rated wire connectors, make the following
electrical connections:
a. Connect the black fixture lead to the voltage supply position of
the terminal block or Hot 1 (for 208/240V wiring).
b. Connect the white fixture lead to the neutral supply position of
the terminal block or Hot 2 (for 208/240V wiring).
c. Connect the green or green/yellow ground lead to the green wire
position of the terminal block.
d. If Dimming is an option; connect the violet dimming positive lead
to the supply dimming positive lead.
e. If Dimming is an option; connect the grey dimming negative lead
to the supply dimming negative lead
© 2019 Cree Lighting, A company of IDEAL INDUSTRIES. All rights reserved. For informational purposes only. Content
is subject to change. See www.creelighting.com/warranty for warranty and specifications. Cree
registered trademarks of Cree, Inc. 304 Series™ is a trademark of Cree Lighting, A company of IDEAL
INDUSTRIES.
3 of 3
7
STEP 8:
Rotate panel to horizontal position and push upward into the existing
Figure 6.
luminaire housing,
using key slots in panel,
securing it into place.
STEP 9:
Secure fixture panel in place by tightening mounting screws. For best
results tighten screws half way in clockwise fashion. Then repeat order,
tightening completely.
STEP 10:
Reconnect power to the fixture.
LINE
OR HOT 1
GREEN
NEUTRAL
OR HOT 2
VIOLET
GREY
and the Cree logo are
®
Slide panel over mounting screw heads
Figure 7
. This will allow for panel support while
LUMINAIRE
LINE-BLACK
GROUND-GREEN
NEUTRAL-WHITE
DIM (+) VIOLET
DIM (-) GREY
www.creelighting.com
CI343X02R3_A