Cres Cor HS5-203913-HT 운영 및 유지보수 지침 매뉴얼 - 페이지 2
{카테고리_이름} Cres Cor HS5-203913-HT에 대한 운영 및 유지보수 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Cres Cor HS5-203913-HT 8 페이지.
FL-2418
HEATED SHELF
Rev. 0 (12/20)
Page 2 of 8
5925 Heisley Road • Mentor, OH 44060-1833
OPERATING AND MAINTENANCE INSTRUCTIONS
MODELS HS Heated Shelf Units
HOW TO INSTALL UNIT:
1. Remove all packaging material and protective paper from on and around unit.
2. Position on level floor and/or adjust legs so that unit is stable and level.
3. Use optional seismic bracket to anchor unit to stable surface as needed.
4. Make sure power switch is in OFF position and plug power cord into proper wall receptacle.
FIRST TIME OPERATION:
NOTE: A new heated shelf unit may need to fully "burn off" manufacturing oils
and excessive adhesive before first use.
1. Press power switch on. Light will illuminate.
2. Press all shelf switches on. Switch will be in the "I" position and you will be able to see red on the other
side of the switch.
3. Turn temperature control knob to HIGH.
4. Let unit run for 1 hour
5. Push power switch off and let cool.
6. Wipe all shelves with detergent and hot water.
Call Toll-free: 877-CRES COR (273-7267) • Fax: 800-822-0393 • www.crescor.com