ABB Navigator 550 교체 절차 - 페이지 2
{카테고리_이름} ABB Navigator 550에 대한 교체 절차을 온라인으로 검색하거나 PDF를 다운로드하세요. ABB Navigator 550 8 페이지. Low level dissolved oxygen wet-section
ABB Navigator 550에 대해서도 마찬가지입니다: 시운전 지침 (8 페이지), 빠른 시작 매뉴얼 (8 페이지), 매뉴얼 (6 페이지), 예비 부품 교체 절차 (4 페이지), 매뉴얼 (9 페이지)
3 Safety
Warning.
These procedures must be carried out by a trained technician.
CHEMICAL
Ensure personal protective equipment (PPE) such as
and
gloves
eye protection
maintenance.
Observe all health and safety procedures for handling
chemicals.
To familiarize yourself with handling precautions, dangers
and emergency procedures, always review the Material
Safety Data Sheets prior to handling containers,
reservoirs and delivery systems that contain chemical
reagents and standards.
Take care if cleaning any spillages and observe all relevant
safety instructions. Wipe up any spillages using clean
water.
Perform general cleaning of the wet-section using a damp
cloth only – mild detergent can be used as a cleaning aid.
Do not use Acetone or any organic solvents.
ELECTRICAL
Isolate all high voltage supplies to the transmitter before
performing replacement procedures.
The wet-section is vulnerable to electrostatic damage.
Wear an anti-static strap or dismantle the wet-section on
an anti-static workbench.
Ensure all electrical connections are kept dry at all times.
GENERAL
Shut off the external sample supply to the wet-section
before performing replacement procedures. When a
procedure is complete, restore power to the transmitter,
sample to the wet-section at the correct flow rate and, if
necessary, calibrate the wet-section – refer to the
wet-section Operating Instructions (OI/ADS550-EN) for
calibration instructions.
Dispose of the old components in accordance with the
guidelines contained in the Operating instructions
(OI/ADS550-EN).
2
INF12/113–EN Rev. C | Navigator 550 | Low level dissolved oxygen wet-section | Spares replacement procedures
are worn during any
4 Replacement procedures
Modbus cable assembly –
see Section 4.5, page 5
Fig. 4.1 Low level dissolved oxygen wet-section – replacement procedures
3 Safety
PCB housing O-rings,
PCB cover and PCB
see Section 4.1, page 3
Tundish assembly –
see Section 4.2, page 3
Flowmeter assembly –
see Section 4.3, page 4
Drain valve assembly
and drain valve cable –
see Section 4.4, page 4