ABB NGC Series 빠른 시작 매뉴얼

{카테고리_이름} ABB NGC Series에 대한 빠른 시작 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. ABB NGC Series 2 페이지. Natural gas analyzers
ABB NGC Series에 대해서도 마찬가지입니다: 빠른 시작 매뉴얼 (2 페이지)

ABB NGC Series 빠른 시작 매뉴얼
Comm1 and Comm 2 Pin-outs/Terminations
RS232
RS485
PIN
COMM 1 (J8)
COMM 1 (J8)
1
Power Out
Power Out
2
Ground
Ground
3
Switched Power Out Switched Power Out
4
Operate
Operate
5
Not Used
RRTS
6
Request To Send
Bus +
7
Transmit Data
Bus -
8
Receive Data
No Connection
9
Clear To Send (CTS) No Connection
COMM 2 (J10)
COMM 2 (J10)
1
Power Out
Power Out
2
Ground
Ground
3
Switched Power Out Switched Power Out
4
Operate
Operate
5
Not Used
RRTS
6
Request To Send
Bus +
7
Transmit Data
Bus -
8
Receive Data
No Connection
9
Clear To Send (CTS) No Connection
TERMINATIONS
Comm 1 (J9)
First or Intermediate Unit (RS-485) Pins 2–3
Last or Only Unit (RS-485)
Pins 1–2
RS232
Pins 2–3
Figure 1: Tubing layout
#
Name
1
Carrier gas
2
Cal gas
Feed through
3
assembly
Sample
4
conditioning
module
5
Sample probe
6
Vent lines
Figure 2: NGC Terminal Board
RS422
COMM 1 (J8)
Power Out
Ground
Switched Power
Out
Operate
RTS
Transmit Bus +
Transmit Bus -
Receive Bus +
Receive Bus -
COMM 2 (J10)
Power Out
Ground
Switched Power
Out
Operate
RTS
Transmit Bus +
Transmit Bus -
Receive Bus +
Receive Bus -
Comm 2
(J11)
Pins 2–3
Pins 1–2
Pins 2–3
A B B M E A S U R E M E N T & A N A LY T I C S
NGC series
Quick start guide
Natural gas analyzers
Gas chromatograph products
Save this guide. Refer to the code above to access
User Manuals and other product information.
Safety and compliance information is included with
the device in the shipping packaging.
We reserve the right to make technical changes or
modify the contents of this document without prior
notice. Regarding purchase orders, agreements
shall prevail. ABB does not accept any responsibility
whatsoever for potential errors or possible lack of
information in this document.
   
 
NGC  S ERI ES   Q U I C K  STA RT  G UI DE |  2 1 0 6 23 5 - 0 0 1  ( A A )